Skip to content

nPower Scheduler – Solving AM Production Challenges

  • today
  • access_time -
  • location_onTech Hub - Booth 2149
  • blur_circularTech Hub
In this Tech Hub presentation, we will demonstrate how the nPower Scheduler™ can significantly reduce the time and improve the accuracy in the production scheduling of your entire shop floor and result in greater on-time delivery and better customer service. Do you experience any of these Additive Manufacturing (AM) scheduling challenges? • Scheduling build plates that are nested with multiple products and differing post-processing routing steps? • Scheduling work centers based on their capability/approval to produce, their capacity, and material availability? • Scheduling operations that share common setups on a singular resource to save setup time and increase throughput? • Needing your production schedule to respond to and reflect the actual progress of each job on the shop floor? • Intensive labor to manage and schedule your manufacturing resources? Join us to learn how the graphical nPower VUE provides a visual dispatch list of your entire shop floor, showing the jobs scheduled on each resource and providing indication of each resource utilization. The nPower VUE also provides your customer service team information on when orders are scheduled to complete, the current operation and its progress, and the overall work order completion status.
  • David Bennett
    SVP, Development and Product Management
    ProfitKey